Ask every firm to price the same size, frame, roof and opening, then check each quote lists the same work: foundations, lantern, plastering, electrics, building control and VAT. The cheapest quote is often the one with the most left out.
Get three orangery quotes and you will usually get three different numbers, three different layouts and three different ideas of what is included. That is normal. Your job is to turn them into something you can compare.
Are they pricing the same room?
Start here, because most of the gap between quotes is not one firm being greedy. It is each firm pricing a different room.
Before anyone visits, write down what you want and give every firm the same note:
- The footprint: width and how far it comes out from the house.
- The frames: uPVC, aluminium or hardwood.
- The roof: one lantern or two, and roughly how big.
- The opening: keep the back doors, or take the wall out.
- What goes inside: a kitchen, underfloor heating, a wood burner, or none of those.
If a firm suggests something different, that is fine. Ask them to price your version as well, so you have one line that matches the others.
What should every orangery quote include?
A proper quote lists the work, not just a total. Go through each one and tick off these items:
- Foundations, with a note of the depth allowed for and what happens if building control asks for deeper.
- Brickwork or piers, and the bricks: matched to the house or not.
- The roof deck, its insulation and its waterproof finish.
- The lantern: size, glass and whether it opens.
- Frames, doors and glass, with the make if they have one.
- Plastering, electrics, heating and the floor finish, or a clear line saying these are excluded.
- Making good where the new room meets the house.
- The skip, scaffold and clearing up.
- Drawings, structural calculations and the building control fee, or who pays them if not included.
- VAT. Work on an existing home is charged at 20%, so a price “plus VAT” is a fifth higher than it looks.
Anything missing from one quote and included in another explains part of the difference. Ask the firm to add it so you can compare properly.
What do orangery installers usually leave out?
Watch for the jobs that sit on the line between “the orangery” and “the house”. Moving a radiator or a drain. Taking the old patio up. Altering the kitchen behind the opening. Decorating. Landscaping the bit of garden the builders churned up. None of these are unreasonable to leave out, but you need to know.
The other one is provisional sums. A quote may say “foundations, provisional sum £X”. That means the real cost will be whatever it turns out to be. It is honest where nobody can know yet, such as ground conditions, but a quote that is mostly provisional sums is not much of a price.
Is the cheapest quote the one to take?
Not on its own. Check the low quote against the typical figures on our orangery cost page. If it is well below the range for your size and frame, find out why before you get excited. It may have left things out, or the firm may be hungry for work. Both are worth knowing.
Then look at the paperwork. Who applies for building regulations approval, and will you get a completion certificate at the end? Will the electrics come with a certificate from an electrician registered with a competent person scheme? A firm that answers those questions clearly is usually a firm that finishes properly.
What rights do you have once you sign?
Two are worth knowing. If you sign the contract at home with the salesperson there, you can usually cancel within 14 days of the day you entered into it. And the law says any trader supplying a service must do the work with reasonable care and skill, whatever the contract says.
Neither of those replaces a clear written contract. Agree the price, what is included, the payment stages and roughly when work will start before anyone digs.
Want quotes you can compare?
Send us the details of your orangery and we will find a firm that builds near you, give you their name first, and pass on the details you have already worked out. It is free and there is no obligation.
Sources and how the figures are worked out
Rules are for England unless the text says otherwise, and are general guidance. Your council decides for your house.
- The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulation 30 (legislation.gov.uk)
- Consumer Rights Act 2015, section 49 (legislation.gov.uk)
- Competent person schemes: current schemes and how schemes are authorised (GOV.UK)
- Building regulations approval (GOV.UK)